#OpalTower #Icon #Failure
I look at WSP’s response to the Final Report regarding the Opal Tower Failure. Looks like the project was procured via a design and construction methodology with changes made to the approved engineering design.
Read More:
Why Buildings Stand Up
https://amzn.to/2stNb5O
Why Buildings Fall Down Why Structures Fail
https://amzn.to/2RqpREZ
References
WSP’S APPROVED FOR CONSTRUCTION DESIGN MEETS NATIONAL CONSTRUCTION CODE
https://www.wsp.com/en-AU/news/2019/wsps-design-meets-code